Acoustic Requirements BE (NBN S 01-400-1/-3)Which DA, RA,50, L′nT,w, LI,50, DAtr, service-equipment level and absorption a room pair, façade pane, installation or common space needs in Belgium — dwellings by class A/B/C (NBN S 01-400-1:2022) or non-residential buildings by type (NBN S 01-400-3:2026) — and whether a measured value passes with the in-situ tolerance.Benchmark tested · 32/32 · Acoustics & Noise · Benchmark reportENUADENLFRESPL
Lift Waiting Time SimulatorAnimated, deterministic simulation of a lift group: how long people really wait (mean, 95th percentile, share over 60 s) and what changes it — call buttons vs destination keypads, dispatch rules, zoning, parking, habits, one more car or faster doors — with an A/B comparison on the same passengers.Benchmark tested · 30/30 · Buildings / Vertical Transport · Benchmark reportENUADENLFRESPL
Sanitary Fixture CountMinimum WCs, urinals, washbasins, washing taps and showers per zone for the people working in a building — Belgian Codex, German ASR A4.1 or UK HSE L24 — and the fixture inventory for the whole plumbing package.Benchmark tested · 90/90 · Plumbing & Sanitary · Benchmark reportENUADENLFRESPL
Separator sizingVertical or horizontal gas-liquid separator sizing by the Souders-Brown method (GPSA Section 7, API Spec 12J): allowable gas velocity, vessel diameter, shell height or length, liquid volume and a to-scale sketch.Benchmark tested · 14/14 · Oil, Gas & Hydrogen · Benchmark reportENUADENLFRESPL
Thermodynamic CyclesVapour power and refrigeration cycles — Rankine with reheat or regenerative feedwater heating, and vapour-compression with an internal heat exchanger, two-stage flash economiser or transcritical CO2 — for nine working fluids, plotted on T–s, h–s, lg p–h, lg p–v and T–h diagrams.Benchmark tested · 57/57 · Thermodynamics, Heat & Fluid Flow · Benchmark reportENUADENLFRESPL
Window Performance Classes (BE)Which air, water and wind classes a window or curtain wall must have on a Belgian site — from height, basic wind speed and terrain by NBN B 25-002-1 — plus operating-force, misuse, durability, impact and burglary classes, a surface-condensation check (fRsi) and the window U-value.Benchmark tested · 358/358 · Building Physics & Envelope · Benchmark reportENUADENLFRESPL
Relief / Blowdown / DepressurisationPipe / Vessel Transients — dynamic rigid-vessel depressurisation for ideal gas or superheated steam through an orifice, Kv/Cv valve or lumped-loss pipe, with wall heat transfer and target-pressure event detection. Optional steam mode continues the vessel inventory through the saturation dome as a homogeneous-equilibrium water/steam mixture.Prototype · Pipe & Vessel Transients · Benchmark reportENUADENLFRESPL
Beam DiagramsShear-force and bending-moment diagrams for beams. Choose the supports, add point, distributed and triangular loads or applied moments, and read the reactions and internal-force diagrams.Benchmark tested · 22/22 · Structures & Mechanics · Benchmark reportENUADENLFRESPL
Glass Thickness for Wind, Snow & Climate LoadsIs this pane thick enough? Single, laminated, double or triple glazing on 4, 3 or 2 edges in a façade or a roof: stress (ULS) and deflection (SLS) under wind, snow, self-weight and the climatic pressure in the cavities, by NBN S 23-002-2:2020 — with the thinnest passing composition.Benchmark tested · 87/87 · Building Physics & Envelope · Benchmark reportENUADENLFRESPL
Hydrate inhibitionMethanol or glycol injection rate for a required hydrate temperature depression by Hammerschmidt or Nielsen-Bucklin (GPSA Section 20): rich-phase inhibitor fraction, lean solution and pure inhibitor rates, and a rich-phase mass split diagram.Benchmark tested · 14/14 · Oil, Gas & Hydrogen · Benchmark reportENUADENLFRESPL
Lift Traffic Design (round-trip time)Classical up-peak lift design: round-trip time, interval, 5-minute handling capacity, %POP and an average waiting time estimate against criteria for the building use; sizing grid of cars × load × speed, zoning of tall buildings with express runs, and why one-floor trips never reach rated speed.Benchmark tested · 245/245 · Buildings / Vertical Transport · Benchmark reportENUADENLFRESPL
Drinking Water Pipe SizingPeak flow from the fixtures (DIN 1988-300 per building type, or EN 806-3 loading units), pipe sizes of the service pipe, main, riser and floor branches by velocity and available pressure, residual pressure at the worst fixture and whether a booster is needed.Benchmark tested · 37/37 · Plumbing & Sanitary · Benchmark reportENUADENLFRESPL
Erosional velocityErosional velocity of gas, liquid and two-phase production lines by the API RP 14E C-factor equation (5th ed., 1991, reaffirmed 2013): no-slip mixture velocity against Ve = C/√ρm, velocity ratio, minimum inner diameter and a to-scale pipe cross-section.Benchmark tested · 14/14 · Oil, Gas & Hydrogen · Benchmark reportENUADENLFRESPL
Safety Glazing Selector (BE)Which breakage type and EN 12600 class the glass needs where people can hit it or fall through it — windows, doors, sloped glazing, roofs, ceilings, cladding, showers and glass balustrades — by NBN S 23-002/A1 and NBN B 03-004, with a pass / fail check of every pane.Benchmark tested · 155/155 · Building Physics & Envelope · Benchmark reportENUADENLFRESPL
Impact Sound Between Rooms (EN ISO 12354-2)What L′nT,w a heavy floor gives in the room below or beside — bare slab, floating screed, soft covering, ceiling lining and flanking walls by the EN ISO 12354-2 simplified model — which path dominates and whether the Belgian limit is met whatever the floor covering.Benchmark tested · 35/35 · Acoustics & Noise · Benchmark reportENUADENLFRESPL
Flare radiationThermal radiation from an elevated flare by the API Std 521 Annex C point-source method: flame length, wind tilt, radiation at a receptor, minimum safe distance and stack height, with a grade-level radiation profile.Benchmark tested · 15/15 · Oil, Gas & Hydrogen · Benchmark reportENUADENLFRESPL
Cost & Schedule Risk (Monte Carlo)How much contingency for P50 / P80, and which risks drive it? Simulates three-point cost ranges, risk events and a schedule of parallel paths together, with rank correlation, time-dependent cost and capped delay damages; gives the confidence of the base estimate, the contingency at any P, the S-curves, the joint cost-schedule confidence and a tornado of the drivers.Benchmark tested · 57/57 · Tendering & Contracts · Benchmark reportENUADENLFRESPL
Booster Set SizingIs a booster needed for this building and mains pressure? Floor-by-floor pressure balance (EN 806-2, DIN 1988-500), set pressure and pump head, DIN 1988-300 peak flow, duty and standby pumps, membrane vessel and starts per hour, break tank, 5 bar static limit with PRV floors or pressure zones, energy per year; hand-off to operatingpoint.Benchmark tested · 58/58 · Plumbing & Sanitary · Benchmark reportENUADENLFRESPL
Drainage & Venting (EN 12056-2)Discharge units per system I–IV, design flow Qww = K·√ΣDU, branch, stack and drain diameters from the EN 12056-2 tables, filling degree and velocity of drains by Prandtl–Colebrook, branch length limits, primary/secondary ventilation and air admittance valves.Benchmark tested · 75/75 · Plumbing & Sanitary · Benchmark reportENUADENLFRESPL
Gas dispersionDownwind distance and width of a continuous gas release to the LFL or a toxic level, using a Gaussian plume (Pasquill-Gifford) or Britter-McQuaid dense gas model.Benchmark tested · 8/8 · Oil, Gas & Hydrogen · Benchmark reportENUADENLFRESPL
Wastewater Lifting Station (EN 12056-4)Fixtures below the backflow level: inflow from discharge units and rain, rising main kept between 0.7 and 2.3 m/s, pump duty point, sump useful volume from starts per hour and rising-main volume, single or duplex plant, backflow loop.Benchmark tested · 51/51 · Plumbing & Sanitary · Benchmark reportENUADENLFRESPL
Rainwater Reuse & InfiltrationRainwater tank for a roof and a demand (WC, laundry, garden) by a daily balance on 30 synthetic years of Uccle rain: coverage, rainwater used, overflow days, savings in EUR, yield-versus-volume curve, the DIN 1989-1 simplified size — and the minimum tank, infiltration and buffer volumes of the Flemish GSV Hemelwater 2023.Benchmark tested · 64/64 · Plumbing & Sanitary · Benchmark reportENUADENLFRESPL
Water Saving & Fixture EfficiencyBuilding water use by fixture class before and after efficient products (dual-flush WCs, urinal controls or waterless urinals, aerators, low-flow showers, push-button and sensor taps, greywater for flushing): m³ and litres per person and day, hot-water energy, CO₂, EUR per year, investment and simple payback, measures ranked.Benchmark tested · 38/38 · Plumbing & Sanitary · Benchmark reportENUADENLFRESPL
Electrolyser SizingSizes a PEM, alkaline or SOEC electrolysis plant from rated power: polarisation curve, hydrogen output, system kWh/kg and efficiency on LHV and HHV basis, stacks, heat, water and voltage degradation over stack life.Benchmark tested · 16/16 · Oil, Gas & Hydrogen · Benchmark reportENUADENLFRESPL
Blue Hydrogen SMR/ATRMass and energy balance of steam methane reforming or autothermal reforming with CO₂ capture: reformer equilibrium, shift, PSA, natural gas use (LHV), captured and emitted CO₂ and carbon intensity against the 3.38 kg CO₂e/kg low-carbon threshold.Benchmark tested · 16/16 · Oil, Gas & Hydrogen · Benchmark reportENUADENLFRESPL
Hydrogen CompressorSizes a multi-stage intercooled hydrogen compressor with real-gas properties from GERG-2008 (ISO 20765-2:2015) and Leachman (2009): stage ratio, discharge temperatures, intercooler duty, shaft power and kWh per kg.Benchmark tested · 16/16 · Oil, Gas & Hydrogen · Benchmark reportENUADENLFRESPL
Hydrogen Storage VesselSizes a bank of compressed-hydrogen vessels (Types I-IV, EN 17533:2020) with real-gas density from Leachman (2009): usable mass per vessel, number of vessels, ideal-gas error, burst pressure and LHV energy.Benchmark tested · 16/16 · Oil, Gas & Hydrogen · Benchmark reportENUADENLFRESPL
Hydrogen Underground StorageWorking gas, cushion gas, energy (LHV), withdrawal rate and annual throughput of a hydrogen salt cavern from its volume, depth and the lithostatic pressure window (Caglayan et al. 2020), with Leachman (2009) real-gas density.Benchmark tested · 19/19 · Oil, Gas & Hydrogen · Benchmark reportENUADENLFRESPL
LH2 Boil-offBoil-off of a vented liquid hydrogen tank from heat leak and ortho-para conversion (Petitpas, LLNL 2018): initial rate in %/day, mass and LHV energy lost over the storage period, and the para fraction at the end.Benchmark tested · 16/16 · Oil, Gas & Hydrogen · Benchmark reportENUADENLFRESPL
Project WorkspaceTransport and overview hub for one project package: open, export or clear it, see what every tool wrote, and resolve every cross-reference against the register that owns the identifier.Benchmark tested · 112/112 · Project & Delivery · Benchmark reportENUADENLFRESPL
Functional Description BuilderControl narrative of one system: operating modes, GRAFCET/SFC sequences, control loops, interlocks and alarms, checked for unreachable steps, dead ends, non-deterministic transitions, unknown tags and setpoints outside the instrument range.Benchmark tested · 106/106 · Control & Systems · Benchmark reportENUADENLFRESPL
Cause & Effect MatrixBuilds a cause and effect matrix — causes with voting, delay and bypass, effects with safe state, latch and reset — evaluates any cause scenario and reviews every combination for conflicts, coverage, reset and convention gaps.Benchmark tested · 100/100 · Control & Systems · Benchmark reportENUADENLFRESPL
I/O ListBuilds a control system's I/O list: tag, signal and electrical type, range, fail state and SIL per signal, then allocates channels to cards and reports counts, spare and findings.Benchmark tested · 159/159 · Control & Systems · Benchmark reportENUADENLFRESPL
Equipment Datasheet BuilderBuilds process and technical datasheets for eleven equipment types, with values per operating case in SI, pulls from attached calculations with their trace, consistency rules and revision comparison.Benchmark tested · 105/105 · Project & Delivery · Benchmark reportENUADENLFRESPL