11 tools for building plumbing and sanitary installations: sanitary fixture counts, drinking-water pipe sizing, hot water storage and circulation, legionella control, backflow protection, booster sets, drainage and venting, lifting stations, rainwater reuse and water saving.
Sanitary Fixture CountMinimum WCs, urinals, washbasins, washing taps and showers per zone for the people working in a building — Belgian Codex, German ASR A4.1 or UK HSE L24 — and the fixture inventory for the whole plumbing package.Benchmark tested · 90/90 · Stages: Concept, Basic engineering · Benchmark reportENUADENLFRESPL
Drinking Water Pipe SizingPeak flow from the fixtures (DIN 1988-300 per building type, or EN 806-3 loading units), pipe sizes of the service pipe, main, riser and floor branches by velocity and available pressure, residual pressure at the worst fixture and whether a booster is needed.Benchmark tested · 37/37 · Stages: Basic engineering, Detailed engineering · Benchmark reportENUADENLFRESPL
DHW Circulation & BalancingHeat losses of a hot-water circulation loop, circulation flow (DVGW W 553 split, thermostatic valves or no valves), exact temperatures in every riser, pump flow and head, balancing valve kv, annual loss in kWh and EUR, and the sections that fall below 55 °C.Benchmark tested · 47/47 · Stages: Detailed engineering, Commissioning · Benchmark reportENUADENLFRESPL
Legionella Risk & Dead LegsWhich obligations of the Flemish Legionellabesluit apply (high-risk, moderate-risk, the 40-person exemption), what laboratory results in KVE/l mean, dead-leg volumes against the 3-litre rule, an ordinal risk class with reasons and a control plan of periodic tasks for the maintenance planner.Benchmark tested · 53/53 · Stages: Detailed engineering, Handover, Operation & maintenance · Benchmark reportENUADENLFRESPL
Booster Set SizingIs a booster needed for this building and mains pressure? Floor-by-floor pressure balance (EN 806-2, DIN 1988-500), set pressure and pump head, DIN 1988-300 peak flow, duty and standby pumps, membrane vessel and starts per hour, break tank, 5 bar static limit with PRV floors or pressure zones, energy per year; hand-off to operatingpoint.Benchmark tested · 58/58 · Stages: Basic engineering, Detailed engineering · Benchmark reportENUADENLFRESPL
Drainage & Venting (EN 12056-2)Discharge units per system I–IV, design flow Qww = K·√ΣDU, branch, stack and drain diameters from the EN 12056-2 tables, filling degree and velocity of drains by Prandtl–Colebrook, branch length limits, primary/secondary ventilation and air admittance valves.Benchmark tested · 75/75 · Stages: Basic engineering, Detailed engineering · Benchmark reportENUADENLFRESPL
Rainwater Reuse & InfiltrationRainwater tank for a roof and a demand (WC, laundry, garden) by a daily balance on 30 synthetic years of Uccle rain: coverage, rainwater used, overflow days, savings in EUR, yield-versus-volume curve, the DIN 1989-1 simplified size — and the minimum tank, infiltration and buffer volumes of the Flemish GSV Hemelwater 2023.Benchmark tested · 64/64 · Stages: Basic engineering, Detailed engineering · Benchmark reportENUADENLFRESPL
Water Saving & Fixture EfficiencyBuilding water use by fixture class before and after efficient products (dual-flush WCs, urinal controls or waterless urinals, aerators, low-flow showers, push-button and sensor taps, greywater for flushing): m³ and litres per person and day, hot-water energy, CO₂, EUR per year, investment and simple payback, measures ranked.Benchmark tested · 38/38 · Stages: Basic engineering, Detailed engineering, Operation & maintenance · Benchmark reportENUADENLFRESPL